CN Rail Culvert Installation

Calgary Tunnelling was hired by CN Rail in Manitoba to perform the service of Horizontal Augering to install a culvert at a Rail Way crossing. Horizontal Augering enables the installation of underground utilities (water, Sewer, Electrical, etc.) with minimal ground disturbance. Augering also allows to be completed while limiting environmental impact. Calgary Tunnelling can install pipe from 12” to 72”.

This job was completed without incident and with a limited impact on the environment and surrounding area.